Beginning in 2007, representatives from the Oil & Gas and Petrochemical industries participated in an OpenO&M End-User Advisory Group to provide the highest valued Use Cases with interoperability scenarios required for organizations to meet their business objectives. These have been continuously developed and refined through the OGI Pilot.
Current Use Cases
- OIIE Use Case 1 – Information Handover from EPC to O/O
- OIIE Use Case 2 – Engineering Updates
- OIIE Use Case 3 – Field Changes to Plant/Facility Engineering
- OIIE Use Case 4 – Online Product Data Library Management
- OIIE Use Case 5 – Asset Installation/Removal Updates
- OIIE Use Case 6 – Preventive Maintenance Triggering
- OIIE Use Case 7 – Condition-Based Maintenance Triggering
- OIIE Use Case 8 – Early Warning Notifications
- OIIE Use Case 9 – Incident Management/Accountability
- OIIE Use Case 10 – Information Provisioning of O&M Systems
- OIIE Use Case 11 – Enterprise Reference Data Library Management
Pending Use Cases
These are use cases in which owner/operators have expressed interest, but detailed analysis work has not yet been completed.
- OIIE Use Case – Asset Configuration Management
- OIIE Use Case – Lockout-Tagout
- OIIE Use Case – Reference Data Standardization
- OIIE Use Case – Capital Project Tag Generation
Scenarios
Each of the above Use Cases have a number of interoperability scenarios that indicate the source and target systems, information payload and format, triggers and transfer mechanism. The OIIE™ Systems Landscape Data Flow Diagram below provides a single visual rendering of the scenarios with the relevant system blocks that represent categories of data/information repositories, and arrows that represent the standardized information data flow scenarios between the system blocks.
No. | Method | Data | From System/s | To System/s |
---|---|---|---|---|
1 | Publish | As-Designed/As-Built Engineering Network/Segment/Tag | ENG | REG-LOCATION |
2 | Publish | As-Designed/As-Built Engineering Network/Segment/Tag | REG-LOCATION | O&M |
3 | Publish | As-Maintained Engineering Network/Segment/Tag | O&M | O&M |
4 | Publish | As-Built Engineering Asset | CONSTRUCT | REG-ASSET |
5 | Publish | As-Built Engineering Asset | REG-ASSET | O&M |
6 | Publish | As-Maintained Engineering Asset | O&M | O&M |
7 | Pull | OEM Model | MATERIALS, PDM | REG-MODEL |
8 | Pull | OEM Model | REG-MODEL | O&M |
9 | Publish | OEM Model | O&M | O&M |
10 | Push | Intelligent Device Removal/Installation | CONTROL | MMS |
11 | Publish | Asset Removal/Installation | MMS | O&M |
12 | Pull | Usage Readings | HIST | MMS, ORM |
13 | Publish | Usage Readings | HIST | MMS, ORM |
14 | Push | CBO/CBM Advisories | ORM | MMS, CONTROL |
15 | Pull | Work Status/Work History | MMS, CONTROL | O&M |
16 | Publish | Work Status/Work History | MMS, CONTROL | O&M |
17 | Pull | Maintenance KPIs | MMS | ERP, ERM, PORT, MES, OPM |
18 | Publish | Maintenance KPIs | MMS | ERP, ERM, PORT, MES, OPM |
19 | Pull | Performance KPIs | ORM | ERP, ERM, PORT, OPM |
20 | Publish | Performance KPIs | ORM | ERP, ERM, PORT, OPM |
21 | Pull | Significant ORM Events | ORM | ERP, ERM, PORT, OPM |
22 | Publish | Significant ORM Events | ORM | ERP, ERM, PORT, OPM |
23 | Pull | OPM KPIs | OPM | ERP, ERM, PORT, MES |
24 | Publish | OPM KPIs | OPM | ERP, ERM, PORT, MES |
25 | Publish | Product/Part Engineering Change Advisories | OEM PDM | REG-MODEL |
26 | Publish | Product/Part Engineering Change Advisories | REG-MODEL | O&M |
27 | Publish | Plant/Process Change Advisories | ENG | REG-LOCATION |
28 | Publish | Plant/Process Change Advisories | REG-LOCATION | O&M |
29 | Publish | Current Operational Data and State Events | CONTROL | O&M |
30 | Publish | Current Condition Data and State Events | CMS | O&M |
31 | Pull | Historical Operational Data and State Events | CONTROL | O&M |
32 | Pull | Historical Condition Data and State Events | CMS | O&M |
33 | Pull | Asset Removal/Installation | REG-ASSET | O&M |
34 | Pull | Reference Data | External RDL | Enterprise RDL |
35 | Pull | Reference Data | Enterprise RDL | O&M |
Note When mapping Publish, Push and Pull actions to ISBM services, Publish uses the Publish-Subscribe services, while Push and Pull actions use Request-Response services.
Note When mapping Publish, Push and Pull actions to OAGIS BOD Verbs, Publish may use the Sync verb, while Push and Pull actions may use Process-Acknowledge and Get-Show verbs respectively.
Systems Requiring Interoperability
- AHMS
- Asset Health Management System
- CMMS
- Computerized Maintenance Management System
- CMS
- Condition Monitoring System
- CONSTRUCT
- Construction Management System
- DCS
- Distributed Control System
- ECM
- Enterprise Content Management
- EAM
- Enterprise Asset Management System
- EH&S
- Environmental Health & Safety
- EMS
- Environmental Management System
- ENG
- Engineering Design System
- ERM
- Enterprise Risk Management System
- ERP
- Enterprise Resource Planning System
- FRACAS
- Failure Reporting, Analysis and Corrective Action System
- HMI
- Human-Machine Interface (Operator Console) System
- ISBM
- Information Service Bus Model
- ISSOW
- Integrated Safe System Of Work
- LIMS
- Lab Information Management System
- MATERIALS
- Material/Procurement Management System
- MES
- Manufacturing Execution System
- OPM
- Operational Performance Modelling & Optimization System
- ORM
- Operational Risk Management System
- PRODUCT
- Product Data Management System
- PLC
- Programmable Logic Controller
- PORT
- Enterprise KPI/Event Portal
- PSMS
- Process Safety Management System
- QMS
- Quality Management System
- RDL
- Reference Data Library
- REG
- O&M Structure, Asset, Model & Index Registry with Standardized Data Dictionary/Taxonomy
- SCADA
- Supervisory Control and Data Acquisition
- SHES
- Safety, Health, and Environmental System
- SIS
- Safety Instrumented System